Description
Kunming Metro Line 4 connects the northwest high-tech development zone with Bailongtan in the Chenggong New District through the central zone and the economic development zone. The total length of the line is 43.5 kilometres, including 29 stations.
Solution
FST on steel springs was defined for two sections with the following specifications: Particularly sensitive area: insertion loss 20 dB and 5 dB ground-borne noise reduction. Highly sensitive area: 15 dB and 3 dB ground-borne noise reduction.
Helical Steel Springs
Material
1.9 km
Installed length
100 km/h
Design speed
2019/4 – 2019/10
Installation
14 T
Axle load
Helical Steel Spring according to
DIN EN 13906
Product details