Description
Beijing Metro Line 6 has a total length of 52.9 kilometers and a total of 34 underground stations.
Solution
The installation of rubber boots provides a degree of elasticity, which ensures a smooth track deflection, proper load distribution of the rail, and good noise and vibration control. The track system has a concrete block in a rubber boot and a block pad embedded in a concrete slab.
EPDM
Material
100 km/h
Design speed
2017/10 – 2017/12
Installation
50 kg/m + 60 kg/m
Rail type
50 m
Installed lenght
microcellular pads
t = 15 mm
cv = 14 – 22 kN/mm
Product details
Zhejiang Tiantie Industry Co., Ltd.
No. 928, Renmin East Road
Tiantai (317200)
Taizhou, Zhejiang, China
Phone 0086-(0)576 8317 1283
Fax 0086-(0)576 -8308 6288
Email info@tiantiegroup.com
International Business Office
Email info@tiantiegroup.com