logo
  • our products
    railway+road
    • vibration control
    • noise control
    • level crossing
    buildings
    • building base isolation
    • seismic control
    industrial
    • rubber sealing
    • rubber waterstop
    • car industry sealing
    technical terms
    show all
  • what we do
    metro line
    • Nanchang Metro Line 1 - Track Mats for FST
    • Shanghai Metro Line 16 - Track Mats for FST
    • Kunming Metro Line 4 - Steel Springs for FST
    • Shenzhen Metro line 11 - Rubber Bearings for FST
    • Yuxi-Mohan Port to Laos/Belt - Sleeper Boots
    • Beijing Metro Line 6 - Sleeper Boots
    • Shenzhen Metro Line 11 - Rail Damper
    • Shenzhen Metro Line 1 – Rail Damper
    • Changchun Light Rail Line 4 - Rail Damper
    • Shenzhen Metro Line 11 - Sound Absorbing Panels
    • Chongqing Metro Line 4 Rail
    high speed
    • Chengguan Railway - Track Mats
    • Guangzhou–Shenzhen–Hong Kong Passenger Line Shiziyang - Track Mats
    heavy haul
    • Shanxi Middle-South Line - Sleeper Boots
    • The Haoji Railway - Sleeper Boots
    station | depot | port
    • Tri Bien Station
    • Luchaogang Port - Rubber Level Crossing Panel
    show all
  • our industries
    rail + road
    buildings
    industrial
    show all
  • about us
    history
    process
    location
    career
    show all
  • our news
    our news
    exhibtions and fairs
  • contact us
    contact us
    downloads

what we do -

Nanchang Metro Line 1 – Track Mats for FST

Nanchang Metro Line 1 -
Track Mats for FST

project details
Track Mats for FST
Nanchang Metro Line 1

Description

Nanchang Metro Line 1, the first subway line in Nanchang, Jiangxi Province, China has a total length of approx. 28. kilometres. The entire Metro line and its 24 stations are underground.

Solution

More than 140 sites were detected as sensitive areas in terms of ground-borne noise and vibration. A request was made for the installation of FST on highly resilient track mats. Tiantie delivered the track mat USM 1000 W with a very low stiffness to meet the required mitigation measures. Approval measurements have shown an efficiency of 19 dB in higher 1/3 octave bands.

requirements
reduction of train-induced
vibrations through the installation of track mats

NR, CR, SBR

Material

80 km/h

Design speed

2014/9 – 2015/1

Installation

Bored tunnel

Tunnel type

14 T

Axle load

520 m

Installed length

USM 1000W
USM 2030

Product details

impressions
visible
results
tiantie-group_cases_nanchang-metro-line1-viaduct_image03
tiantie-group_cases_nanchang-metro-line1-viaduct_image02
related products
products thought ahead.
a promise is a promise.
logo-alternative

Zhejiang Tiantie Industry Co., Ltd.

No. 928, Renmin East Road
Tiantai (317200)
Taizhou, Zhejiang, China

Phone 0086-(0)576 8317 1283
Fax 0086-(0)576 -8308 6288
Email info@tiantiegroup.com

International Business Office
Email info@tiantiegroup.com

  • contact
  • legal notice
  • privacy policy
  • LinkedIn

contact

  • start
  • our products
  • what we do
  • our industries
  • about us
  • our news
  • contact us