At a length of 52 km, the construction of Shenzhen Metro Line 11 started at the end of 2012. Besides its Express connection to the Airport, it is also part of the Guangzhou-Shenzhen Intercity Line.
Solution
Sound absorbing panels were installed in Tangwei Station on Line 11.
Ceramsite + cement
Material
120 km/h
Design speed
R = 1.3 km
Curved line
400 m
Installed length
5 days
Installation
150 mm
Panel thickness