Description
Shenzhen Metro Line 11 starts at Futian Station, passes through Futian District, Nanshan District, and Bao’an District, runs through the massive airport area and urban business district, and ends at Bitou Station. It has a length of approximately 52 kilometres, including a 35-kilometre underground and a 15-kilometre elevated line. 18 stations have been constructed: 14 underground stations and 4 elevated stations.
Solution
Due to the close distance between the track and residential buildings, N&V mitigation measures become necessary. FST on rubber bearings was installed in the area between Qianhaiwan and Nanshan.
NR, Steel shims
Material
100 km/h
Design speed
2019/4 – 2019/7
Installation
12.1 km
Installed length
Rubber Bearings type III
Product details
Zhejiang Tiantie Industry Co., Ltd.
No. 928, Renmin East Road
Tiantai (317200)
Taizhou, Zhejiang, China
Phone 0086-(0)576 8317 1283
Fax 0086-(0)576 -8308 6288
Email info@tiantiegroup.com
International Business Office
Email info@tiantiegroup.com