Description
The Yuxi-Mohan Railway connects Yuxi Station of Kunyu Railway and Mohan on the border between China and Laos, with a total length of 507 kilometres and 13 intermediate stations. The travel time from Kunming to Pu’er and Xishuangbanna can be significantly reduced; the planned journey time is under 3 hours.
Solution
Sleeper boots promote smooth track deflection and provide a degree of elasticity for the otherwise rigid slab track. Concrete sleepers rest directly on microcell foam pads inside the rubber sleeper boots. The noise and vibration-absorbing sleeper boots are then partially embedded in concrete slabs.
EPDM
Material
160 km/h
Design speed
2020
Installation
500 km
Installed length
microcellular pads
CV = 60 – 90 kN/mm
Product details
Zhejiang Tiantie Industry Co., Ltd.
No. 928, Renmin East Road
Tiantai (317200)
Taizhou, Zhejiang, China
Phone 0086-(0)576 8317 1283
Fax 0086-(0)576 -8308 6288
Email info@tiantiegroup.com
International Business Office
Email info@tiantiegroup.com