Description
The first phase of Chongqing Rail Transit Line 4 is roughly orientated from east-west. This line starts at Min’an Avenue Station and ends at Tangjiatuo Station. The total length is around 15.6 km, divided into an underground segment of about 10 km, and an elevated section of about 5 km. Nine stations have been constructed along the line.
Solution
A plinth track system requires customised sound absorbing panels in between the plinth and the siding.
Ceramsite + cement
Material
100 km/h
Design speed
60 days
Installation
R = 350 m
Curved line
1.5 km
Installed length
150 mm
Panel thickness
Zhejiang Tiantie Industry Co., Ltd.
No. 928, Renmin East Road
Tiantai (317200)
Taizhou, Zhejiang, China
Phone 0086-(0)576 8317 1283
Fax 0086-(0)576 -8308 6288
Email info@tiantiegroup.com
International Business Office
Email info@tiantiegroup.com